Journal

UA video production: how long it really takes

A realistic week-by-week schedule for performance-marketing video, and why the first batch always takes longer than the twentieth.

Production2025-10-147 min read

The honest timeline

A single UA video at production quality takes 5 to 8 working days from a complete brief. A batch of ten takes three to four weeks, not ten times as long, because the script templates, asset library and rendering setup are paid for once.

Week by week

  • Days 1-2 — Brief and reference lock — What the hook is, what the first three seconds show, which competitor creatives are being referenced, what the target CPI or ROAS is. This stage is where most projects lose time, because the answer is usually 'we will know it when we see it'.
  • Days 3-4 — Script and storyboard — Two or three variants approved on paper. Approving on paper is ten times cheaper than approving on pixels.
  • Days 5-6 — Asset assembly and blockout — Existing gameplay, character renders, UI captures assembled into an animatic with timing.
  • Days 7-8 — Final render, sound, delivery — Delivered in every aspect ratio the ad platforms need: 9:16, 1:1, 16:9, with and without safe zones.

Why the first batch is always slow

The first batch establishes the visual language, the render pipeline and the naming conventions. By the fifth batch a studio that has done its homework can turn a variant around in two days, because it is recombining approved components rather than building from zero.

What to measure, and when

  • Do not judge a creative on one day of data
  • Test the hook separately from the body
  • Keep a control creative running at all times
  • Retire a creative on a rolling seven-day window, not a single spike

What a vendor needs from you to hit the timeline

  • The actual game build, not screenshots
  • Brand kit and legal constraints
  • The account's historical CPI and ROAS by market
  • One decision-maker who can approve on paper

That last one is not a formality. Projects with a single approver ship in 60% of the time of projects with a committee.

Back to journal

Have a project to scope?

Send the spec and we will come back with scope and a schedule.